Management for hire

  • Design and ordering of equipment for IVAR sludge treatment plant (5 months)
  • Design and ordering of equipment for Mjøs biowaste plant at Lillehammer (5 months)
  • Operator-controlled maintenance and scorecard at a fish feed producer (1 year)
  • Operational Excellence Manager at a pharmaceutical company(5 months)
  • Operational Excellence support at a pharmaceutical company (1 year)
  • Project manager for the roll-out of a new Laboratory Management System at 32 plants in the same company (11 months)
  • Detail Engineering for a sludge treatment plant at Schijnpoort, Belgium (4 months)

Thank you for your trust

Contact info

Lean Tech AS | Snøfonna 5

0047 481 23 070

This email address is being protected from spambots. You need JavaScript enabled to view it.

Lørenskog, Norway

Lean

L - Look for solutions

E – Enthusiastic

A – Analytical

N - Never give up

Sign up for Newsletter

* indicates required